Another commission work, the result of which I am satisfied. Blender, K-Cycles, about 8-10 hours of work.
The basic model of the building was already there, I needed to remodel the windows, add interiors and correct and prepare the rest of the geometry of the building.
Botaniq and transportation saved me time, as well as preconfigured Maxtree tree
6 Likes
I featured you on BlenderNation, have a great weekend!
1 Like